The Other Model in the Room: Building Utility-Grade Evidence Before Interconnection Review
Utilities run their own production, load-flow, and hosting-capacity models during interconnection review, often with assumptions developers never see. The resulting data asymmetry can turn a manageable study into a costly surprise. Solar engineers need utility-grade evidence before submission, not after the numbers come back.